With regards to the Water Management, the football club needed to measure their usage of water. For this, a Flow Meter was installed showing the amount of water used.
Solar Systems were required to power that Flow Meter. To optimize output and minimize costs for conduits and cabling as much as possible, solar systems were installed on 2 Locations.
After a site visit, the Hollandia Solar Team installed poles of 2 meter height with panel frames, avoiding shading and optimizing the system output. Hollandia Power batteries and charge controller were placed in the existing electrical panel.
All the conduits were neatly placed and correctly Insulated under the sand.